RFID/NFC — object identification and tracking — D&A Tech
D&A Tech
RFID / NFC
1 / 3
D&A Tech products RFID / NFCRFID / NFC / ACCESS CONTROL

Every tag.
A clear event.

Connect an object to its identifier and workflow. The system shows what was read, where, when and what action occurred.

An employee points a handheld reader at a transport case label in the receiving area
INTERACTIVE DEMO

Now try it yourself.

Select an object and reading point. An event with the same ID is recognised as a duplicate; an offline reader creates no movement.

Fictional company
Changes last until refresh
RFID / NFC OverviewDemo data
D&A / IDENTITY & TRACEABILITY

Simulate reading a tag

Select an object and reading point. An event with the same ID is recognised as a duplicate; an offline reader creates no movement.

Objects
2With a linked tag
Events
1Recorded without duplicates
Offline points
0Simulated state
Readers
2Installed points
RFID / EVENT SIMULATOR

Read the tag.
Track the movement.

The event updates the object’s latest location. Reuse the same ID and no duplicate record will appear.

Ready to read the test tag.

LATEST OBJECT LOCATIONS

Location is determined by the installed reading point. Continuous location outside these points is not calculated.

Objects and tags

2
September 2026
Open
Safety harness No. 042Site No. 3DODaniyar OmarovDraft10.09.2026
Tool container No. 017WarehouseRARuslan AmanovDraft10.09.2026
CURRENT REGISTER

Work location

Records by stage

2
Draft2
SYSTEM MODULES

Details behind every number.

Metrics use records from this session and change as you interact.

Scenario basis

Processes are adapted to the enterprise’s documents and conditions. Fields, roles and confirmations on this demo are illustrative. Sources reviewed on 6 September 2026.

D&A TECH / NEW PROJECT

It all starts
with your task.

Enter a phone number or email. We will contact you to discuss your project and arrange a demo.

LET’S DISCUSS YOUR PROJECT

From task
to scale.

Which products do you need?

Select several products — we will combine them into one project.

Number of users
Up to 50 users
Number of users
Sites / departments
1 site
Sites / departments
Where to start
Pilot: core processes
Where to start
Integrations
No integrations in the first phase
Integrations
Project cost

Preliminary estimate; final price is negotiable. Equipment, third-party licences and ongoing support are quoted separately.